{"id":9156,"date":"2026-11-16T17:33:07","date_gmt":"2026-11-16T16:33:07","guid":{"rendered":"https:\/\/leyton.com\/ca\/?post_type=article&#038;p=9156"},"modified":"2026-11-16T17:33:12","modified_gmt":"2026-11-16T16:33:12","slug":"from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred","status":"publish","type":"article","link":"https:\/\/leyton.com\/ca\/en\/insights\/articles\/from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred\/","title":{"rendered":"From Prototype to Production: When Manufacturing Challenges Qualify for SR&amp;ED"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">A prototype is not automatically SR&amp;ED eligible, and production is not automatically excluded. The key question is whether the work addresses technological uncertainty through systematic experimentation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Manufacturers often associate <strong><a href=\"https:\/\/leyton.com\/ca\/en\/tax-credits\/sred-scientific-research-experimental-development\/\">SR&amp;ED<\/a><\/strong> with laboratories, research teams and early prototypes. In practice, experimental development can continue during scale-up, equipment commissioning and selected production runs. The project label is not decisive.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">What matters is whether the team is attempting to achieve technological advancement through systematic investigation or experimentation.<sup>[1][2]<\/sup><\/p>\n\n\n\n<h2 id=\"h-a-prototype-is-evidence-of-a-stage-not-automatic-sr-amp-ed-eligibility\" class=\"wp-block-heading\">A prototype is evidence of a stage, not automatic SR&amp;ED eligibility<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Building a prototype may be necessary to test a concept, but the existence of a prototype does not by itself make the work SR&amp;ED eligible. The technical question is whether competent professionals faced a limitation that could not be resolved using available knowledge or standard practice. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The team should be able to explain the uncertainty, the hypotheses considered, the tests performed and the conclusions drawn.<sup>[1][2]<\/sup><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In manufacturing, that uncertainty may arise from interactions among materials, geometry, tooling, process parameters, controls or equipment. A component may meet its target in a bench test but deform during assembly. A coating may perform at low volume but become unstable at line speed. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A control strategy may work in isolation but create unacceptable variation when connected to the full process. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These are business problems, but they may also contain technological questions when the solution is not readily available.<\/p>\n\n\n\n<h2 id=\"h-scale-up-can-create-new-technological-uncertainty\" class=\"wp-block-heading\">Scale-up can create new technological uncertainty<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Moving from a successful prototype to repeatable production is not merely a larger version of the same task. Heat transfer, cycle time, material flow, vibration, tolerances and control response can behave differently at production scale. The Canada Revenue Agency recognizes that experimental development can occur while scaling up and optimizing a process.<sup>[1]<\/sup><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The eligible work is the systematic effort required to understand and overcome those limitations. Routine engineering that applies known methods, normal installation, operator training and standard commissioning remain outside SR&amp;ED. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The distinction depends on why the work was performed and what technological knowledge the team was attempting to generate, not on whether it occurred in a laboratory or on the shop floor.<sup>[1][2]<\/sup><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Use up and down arrow keys to resize the meta box pane.<\/p>\n\n\n\n<h2 id=\"h-production-is-excluded-but-experimentation-may-occur-during-production\" class=\"wp-block-heading\">Production is excluded, but experimentation may occur during production<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Commercial production itself is excluded. However, an operating line can become the environment in which experimental development is carried out. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A production run, or a defined portion of it, may be required to evaluate a new process window, validate a control strategy or determine whether a modified configuration can meet the technological objective.<sup>[1][3]<\/sup><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The boundary must be explicit. Work related to normal output, standard quality checks and routine troubleshooting must be separated from the experimental portion. When experimental development occurs alongside commercial production, the allowable costs may be limited to the additional or incremental costs reasonably attributable to the experimentation, rather than the full cost of the run.<sup>[3]<\/sup><\/p>\n\n\n\n<h2 id=\"h-five-questions-manufacturers-should-ask\" class=\"wp-block-heading\">Five questions manufacturers should ask<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Before treating a manufacturing challenge as SR&amp;ED, management should test the project against five practical questions:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Was there a technological uncertainty that could not be resolved through standard practice or readily available knowledge?<sup>[1][2]<\/sup><\/li>\n\n\n\n<li>Did the team formulate hypotheses or technical approaches specifically aimed at reducing that uncertainty?<sup>[2]<\/sup><\/li>\n\n\n\n<li>Were those hypotheses tested through planned experiments or analysis, with results influencing the next iteration?<sup>[2]<\/sup><\/li>\n\n\n\n<li>Did the work seek new technological knowledge or know-how, even if the final performance target was not reached?<sup>[1][2]<\/sup><\/li>\n\n\n\n<li>Can the company distinguish the experimental work, people, materials and time period from routine production or commercial activity?<sup>[1][3]<\/sup><\/li>\n<\/ul>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 id=\"h-costs-follow-the-experimental-boundary\" class=\"wp-block-heading\">Costs follow the experimental boundary<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Potential expenditures can include employee time, materials consumed or transformed, SR&amp;ED contracts and other qualifying amounts. The treatment depends on the facts. Materials destroyed or made valueless through testing may be treated differently from materials transformed into an output that retains value. Components incorporated into a prototype or commercial asset also require careful analysis.<sup>[4][5][6]<\/sup><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For production runs, claiming the entire cost because experimentation occurred somewhere in the process is rarely supportable. Companies should identify the experimental period, the personnel directly involved, the extra material loss, the special setup and any incremental overhead. Standard production costs and excess output must be excluded.<sup>[3]<\/sup> This is where cooperation between technical, production and finance teams becomes essential.<\/p>\n\n\n\n<h2 id=\"h-documentation-should-follow-the-iterations\" class=\"wp-block-heading\">Documentation should follow the iterations<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A useful file does not need to be a perfect laboratory notebook. It must, however, show the logic of the work. Manufacturers should retain trial plans, drawings, parameter sheets, machine settings, test data, photographs, samples, scrap records, meeting notes and conclusions. Production records should identify where experimental conditions started and ended, while time and purchasing records should connect the work to the related expenditures.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Failures should remain in the record. An unsuccessful material, configuration or control approach can be valuable evidence because it demonstrates what the team learned and why the next iteration changed. SR&amp;ED does not require commercial success; it requires a systematic attempt to achieve advancement.<sup>[1][2]<\/sup><\/p>\n\n\n\n<h2 id=\"h-three-common-manufacturing-examples\" class=\"wp-block-heading\">Three common manufacturing examples<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Materials: testing formulations or material combinations when known data cannot predict strength, adhesion, durability or behaviour under the required conditions.<\/li>\n\n\n\n<li>Processes: establishing a workable range of temperature, pressure, speed or timing when scale-up creates interactions that standard calculations cannot resolve.<\/li>\n\n\n\n<li>Equipment and controls: modifying tooling, machinery or control logic to overcome a technological limitation, rather than simply installing or configuring known equipment.<\/li>\n<\/ul>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Leyton\u2019s R&amp;D Consultants identify experimental work within broader product-development and production initiatives. We help companies define the eligible boundary, connect it to the right costs and build documentation that is ready for CRA review.<sup>[7]<\/sup><\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 id=\"h-sources\" class=\"wp-block-heading\">Sources<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong><a href=\"https:\/\/www.canada.ca\/en\/revenue-agency\/services\/scientific-research-experimental-development-tax-incentive-program\/sred-eligibility.html\">[1] What work is eligible \u2014 Scientific Research and Experimental Development tax incentives \u2014 Canada Revenue Agency.<\/a><\/strong><\/li>\n\n\n\n<li><strong><a href=\"https:\/\/www.canada.ca\/en\/revenue-agency\/services\/scientific-research-experimental-development-tax-incentive-program\/eligibility-work-investment-tax-credits\/eligibility-work-investment-tax-credits-2015.html\">[2] Eligibility of Work for SR&amp;ED Investment Tax Credits Policy \u2014 Canada Revenue Agency.<\/a><\/strong><\/li>\n\n\n\n<li><strong><a href=\"https:\/\/www.canada.ca\/en\/revenue-agency\/services\/scientific-research-experimental-development-tax-incentive-program\/production-runs-policy-1.html\">[3] SR&amp;ED During Production Runs Policy \u2014 Canada Revenue Agency.<\/a><\/strong><\/li>\n\n\n\n<li><strong><a href=\"https:\/\/www.canada.ca\/en\/revenue-agency\/services\/scientific-research-experimental-development-tax-incentive-program\/sred-claim\/allowable-expenditures.html\">[4] Calculate allowable expenditures \u2014 Scientific Research and Experimental Development tax incentives \u2014 Canada Revenue Agency.<\/a><\/strong><\/li>\n\n\n\n<li><strong><a href=\"https:\/\/www.canada.ca\/en\/revenue-agency\/services\/scientific-research-experimental-development-tax-incentive-program\/while-developing-asset.html\">[5] SR&amp;ED while Developing an Asset Policy \u2014 Canada Revenue Agency.<\/a><\/strong><\/li>\n\n\n\n<li><strong><a href=\"https:\/\/www.canada.ca\/en\/revenue-agency\/services\/scientific-research-experimental-development-tax-incentive-program\/materials-policy.html\">[6] Materials for SR&amp;ED Policy \u2014 Canada Revenue Agency.<\/a><\/strong><\/li>\n<\/ul>\n\n\n\n\n","protected":false},"excerpt":{"rendered":"<p>A prototype is not automatically SR&amp;ED eligible, and production is not automatically excluded. The key question is whether the work addresses technological uncertainty through systematic experimentation. Manufacturers often associate SR&amp;ED with laboratories, research teams and early prototypes. In practice, experimental development can continue during scale-up, equipment commissioning and selected production runs. The project label is [&hellip;]<\/p>\n","protected":false},"author":72,"featured_media":9280,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","format":"standard","meta":{"_acf_changed":false,"_leyton_l4m_sync":false,"footnotes":""},"categories":[110,336],"tags":[641,115],"expertise":[776,399036,774],"class_list":["post-9156","article","type-article","status-publish","format-standard","has-post-thumbnail","hentry","category-sred","category-sred-3","tag-manufacturing","tag-sred-en","expertise-innovation-funding-tax-incentives","expertise-rd-tax-credits","expertise-sred-tax-credits"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.1 (Yoast SEO v28.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>From Prototype to Production: When Manufacturing Challenges Qualify for SR&amp;ED - Leyton Canada<\/title>\n<meta name=\"description\" content=\"Discover when your SR&amp;ED prototype qualifies for tax credits. Learn how scale-up activities and shop floor experimentation meet CRA criteria.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/leyton.com\/ca\/en\/insights\/articles\/from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"From Prototype to Production: When Manufacturing Challenges Qualify for SR&amp;ED\" \/>\n<meta property=\"og:description\" content=\"Discover when your SR&amp;ED prototype qualifies for tax credits. Learn how scale-up activities and shop floor experimentation meet CRA criteria.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/leyton.com\/ca\/en\/insights\/articles\/from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred\/\" \/>\n<meta property=\"og:site_name\" content=\"Leyton\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-16T16:33:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/leyton.com\/wp-content\/blogs.dir\/3\/files\/2026\/11\/Canada-Website-inside-pictures-2026-11-16T114803.105.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"655\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/leyton.com\\\/ca\\\/en\\\/insights\\\/articles\\\/from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred\\\/\",\"url\":\"https:\\\/\\\/leyton.com\\\/ca\\\/en\\\/insights\\\/articles\\\/from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred\\\/\",\"name\":\"From Prototype to Production: When Manufacturing Challenges Qualify for SR&amp;ED - Leyton Canada\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/leyton.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/leyton.com\\\/ca\\\/en\\\/insights\\\/articles\\\/from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/leyton.com\\\/ca\\\/en\\\/insights\\\/articles\\\/from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/leyton.com\\\/wp-content\\\/blogs.dir\\\/3\\\/files\\\/2026\\\/11\\\/Canada-Website-inside-pictures-2026-11-16T114803.105.webp\",\"datePublished\":\"2026-11-16T16:33:07+00:00\",\"dateModified\":\"2026-11-16T16:33:12+00:00\",\"description\":\"Discover when your SR&ED prototype qualifies for tax credits. Learn how scale-up activities and shop floor experimentation meet CRA criteria.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/leyton.com\\\/ca\\\/en\\\/insights\\\/articles\\\/from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/leyton.com\\\/ca\\\/en\\\/insights\\\/articles\\\/from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/leyton.com\\\/ca\\\/en\\\/insights\\\/articles\\\/from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred\\\/#primaryimage\",\"url\":\"https:\\\/\\\/leyton.com\\\/wp-content\\\/blogs.dir\\\/3\\\/files\\\/2026\\\/11\\\/Canada-Website-inside-pictures-2026-11-16T114803.105.webp\",\"contentUrl\":\"https:\\\/\\\/leyton.com\\\/wp-content\\\/blogs.dir\\\/3\\\/files\\\/2026\\\/11\\\/Canada-Website-inside-pictures-2026-11-16T114803.105.webp\",\"width\":1920,\"height\":655,\"caption\":\"prototype SR&ED RS&DE\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/leyton.com\\\/ca\\\/en\\\/insights\\\/articles\\\/from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/leyton.com\\\/ca\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"From Prototype to Production: When Manufacturing Challenges Qualify for SR&amp;ED\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/leyton.com\\\/#website\",\"url\":\"https:\\\/\\\/leyton.com\\\/\",\"name\":\"Leyton\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/leyton.com\\\/ca\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/leyton.com\\\/ca\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/leyton.com\\\/ca\\\/#organization\",\"name\":\"Leyton\",\"url\":\"https:\\\/\\\/leyton.com\\\/ca\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/leyton.com\\\/ca\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/leyton.com\\\/wp-content\\\/blogs.dir\\\/3\\\/files\\\/2026\\\/01\\\/logo.svg\",\"contentUrl\":\"https:\\\/\\\/leyton.com\\\/wp-content\\\/blogs.dir\\\/3\\\/files\\\/2026\\\/01\\\/logo.svg\",\"width\":108,\"height\":44,\"caption\":\"Leyton\"},\"image\":{\"@id\":\"https:\\\/\\\/leyton.com\\\/ca\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"From Prototype to Production: When Manufacturing Challenges Qualify for SR&amp;ED - Leyton Canada","description":"Discover when your SR&ED prototype qualifies for tax credits. Learn how scale-up activities and shop floor experimentation meet CRA criteria.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/leyton.com\/ca\/en\/insights\/articles\/from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred\/","og_locale":"en_US","og_type":"article","og_title":"From Prototype to Production: When Manufacturing Challenges Qualify for SR&amp;ED","og_description":"Discover when your SR&ED prototype qualifies for tax credits. Learn how scale-up activities and shop floor experimentation meet CRA criteria.","og_url":"https:\/\/leyton.com\/ca\/en\/insights\/articles\/from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred\/","og_site_name":"Leyton","article_modified_time":"2026-11-16T16:33:12+00:00","og_image":[{"width":1920,"height":655,"url":"https:\/\/leyton.com\/wp-content\/blogs.dir\/3\/files\/2026\/11\/Canada-Website-inside-pictures-2026-11-16T114803.105.webp","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/leyton.com\/ca\/en\/insights\/articles\/from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred\/","url":"https:\/\/leyton.com\/ca\/en\/insights\/articles\/from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred\/","name":"From Prototype to Production: When Manufacturing Challenges Qualify for SR&amp;ED - Leyton Canada","isPartOf":{"@id":"https:\/\/leyton.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/leyton.com\/ca\/en\/insights\/articles\/from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred\/#primaryimage"},"image":{"@id":"https:\/\/leyton.com\/ca\/en\/insights\/articles\/from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred\/#primaryimage"},"thumbnailUrl":"https:\/\/leyton.com\/wp-content\/blogs.dir\/3\/files\/2026\/11\/Canada-Website-inside-pictures-2026-11-16T114803.105.webp","datePublished":"2026-11-16T16:33:07+00:00","dateModified":"2026-11-16T16:33:12+00:00","description":"Discover when your SR&ED prototype qualifies for tax credits. Learn how scale-up activities and shop floor experimentation meet CRA criteria.","breadcrumb":{"@id":"https:\/\/leyton.com\/ca\/en\/insights\/articles\/from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/leyton.com\/ca\/en\/insights\/articles\/from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/leyton.com\/ca\/en\/insights\/articles\/from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred\/#primaryimage","url":"https:\/\/leyton.com\/wp-content\/blogs.dir\/3\/files\/2026\/11\/Canada-Website-inside-pictures-2026-11-16T114803.105.webp","contentUrl":"https:\/\/leyton.com\/wp-content\/blogs.dir\/3\/files\/2026\/11\/Canada-Website-inside-pictures-2026-11-16T114803.105.webp","width":1920,"height":655,"caption":"prototype SR&ED RS&DE"},{"@type":"BreadcrumbList","@id":"https:\/\/leyton.com\/ca\/en\/insights\/articles\/from-prototype-to-production-when-manufacturing-challenges-qualify-for-sred\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/leyton.com\/ca\/"},{"@type":"ListItem","position":2,"name":"From Prototype to Production: When Manufacturing Challenges Qualify for SR&amp;ED"}]},{"@type":"WebSite","@id":"https:\/\/leyton.com\/#website","url":"https:\/\/leyton.com\/","name":"Leyton","description":"","publisher":{"@id":"https:\/\/leyton.com\/ca\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/leyton.com\/ca\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/leyton.com\/ca\/#organization","name":"Leyton","url":"https:\/\/leyton.com\/ca\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/leyton.com\/ca\/#\/schema\/logo\/image\/","url":"https:\/\/leyton.com\/wp-content\/blogs.dir\/3\/files\/2026\/01\/logo.svg","contentUrl":"https:\/\/leyton.com\/wp-content\/blogs.dir\/3\/files\/2026\/01\/logo.svg","width":108,"height":44,"caption":"Leyton"},"image":{"@id":"https:\/\/leyton.com\/ca\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/leyton.com\/ca\/wp-json\/wp\/v2\/article\/9156","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leyton.com\/ca\/wp-json\/wp\/v2\/article"}],"about":[{"href":"https:\/\/leyton.com\/ca\/wp-json\/wp\/v2\/types\/article"}],"author":[{"embeddable":true,"href":"https:\/\/leyton.com\/ca\/wp-json\/wp\/v2\/users\/72"}],"replies":[{"embeddable":true,"href":"https:\/\/leyton.com\/ca\/wp-json\/wp\/v2\/comments?post=9156"}],"version-history":[{"count":8,"href":"https:\/\/leyton.com\/ca\/wp-json\/wp\/v2\/article\/9156\/revisions"}],"predecessor-version":[{"id":9288,"href":"https:\/\/leyton.com\/ca\/wp-json\/wp\/v2\/article\/9156\/revisions\/9288"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/leyton.com\/ca\/wp-json\/wp\/v2\/media\/9280"}],"wp:attachment":[{"href":"https:\/\/leyton.com\/ca\/wp-json\/wp\/v2\/media?parent=9156"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leyton.com\/ca\/wp-json\/wp\/v2\/categories?post=9156"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leyton.com\/ca\/wp-json\/wp\/v2\/tags?post=9156"},{"taxonomy":"expertise","embeddable":true,"href":"https:\/\/leyton.com\/ca\/wp-json\/wp\/v2\/expertise?post=9156"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}